Las Vegas Data Center

Novva’s newest purpose-built, future-proof data center location: Las Vegas, Nevada. This 275,000 square foot, 100MW Las Vegas data center has been thoughtfully designed with a focus on sustainability and is expected to open in late 2023. Now accepting reservations, book your tour of our Las Vegas data center today!

A colocation oasis

Minutes from recreation of all kinds, North Las Vegas proves an ideal location for Novva’s signature wholocation experience. Here are a few of the reasons why Novva chose North Las Vegas as a critical piece of our offering:

Sustainability icon

Renewable Energy Alternatives

For sustainable data center growth

Low disaster icon

Low Disaster Risk

Disaster risk is considerably lower than the national average.

Lower taxes icon

Tax Abatements

Low sales and use tax, and no state income tax

Location icon

Central Hub

for California and other western markets

Airport icon

Easily Accessible

Ten minutes from a major international airport

Las Vegas Colocation Services

A desert rose for your IT assets, our North Las Vegas location has plenty to offer.

Data Center Campus icon

16-acre campus with 275,000 square feet of data center space

Kilowatt icon

Accomodates 250KW to 30MW clients

Substation icon

Centralized and secure on-campus 100MW owner substation

Fiber icon

Access to numerous major long haul fiber routes and many Tier-1 fiber providers.

Security icon

Robust 24/7 security, 365 days a year

Compliance icon

Adherent to SOC 1, SOC 2, and HIPAA examination standards, and PCI DSS Attestation of Compliance

Data center specifications:

Land Area

20 Acres

Buildings

Single Story, Concrete Tilt-Up Exterior Walls with Interior Steel Columns and Truss with Sheathing Roof Deck

Total Building Area

246,328 SQ FT

Power

100MW

Connectivity

Blended Bandwith, Carrier Neutral, Low Latency

Geographical Risk

Low

Building Size

246,328 SQ FT/p

Utility Power

100 MW Owner Substation

Power Availability

120v, 208v, 240v, 480v.

Sustainability

Waterless cooling, ambient air cooling

Environment

LEED certified Design

UPS

1500 KW Per UPS/ (2) UPS Per Lineup 4=3 Redundancy Blocks Full Build: (6) Total Blocks Distributed Redundant

Generators

3 MW - IT Generator, (8) 3 MW Equipment Generators

Power Availability

120v, 208v, 240v, 480v.

PUE

1.3 Annualized

Fuel Storage

45,000k Total, 5000k Per Generator, Double Wall Belly Tank with 24 Hour Runtime

Mechanical

5,310 Tons of cooling, Air Cooled, Perimeter Fan Walls N+1

Lighting

LED Lighting throughout Building

Facilities

On-site 24x7 staffing

MOPS/SOPS

Yes

Uptime

100% Uptime SLA

Power Distribution

120v, 208v, Overhead Busway

Security

On-Site 24x7 staffing, drone surveilance

Fencing

Full Perimeter Fencing/ Razor Wire at East/North Concrete Screen-Wall at South/West Entrance Gate Authorization

Surveillance

CCTV Campus Wide Surveillance

Office Suites

Available

Lounge

Comfortable seating & workspaces

Cafe

Snacks, coffee and drinks available

Wifi

Secure Wifi available

Conference Rooms

Private conference rooms available

Discover what Novva Data Centers can do for you